Industries / Trades & Home Services

Siding operations.
Automated.

A hail storm came through Wednesday. By Thursday morning 50 homeowners in a 3-mile radius have damage. Your phone is ringing. The contractors who convert those calls into signed contracts in the first 24 hours get the work. The ones who take a week to get the estimate out lose to whoever responded faster. Material lead times on custom colors and specialty profiles can push 4-6 weeks. If that conversation doesn't happen at contract signing, the homeowner finds out when your crew shows up with the wrong product.

What's costing you jobs and margin

Siding work has two distinct problems: lead conversion speed after storm events, and material and scope documentation that prevents callbacks on insurance jobs.

Storm Lead Response Speed

After a major hail or wind event, the homeowners who get a contractor on their property in the first 24-48 hours are far more likely to sign. Three weeks later, when the market is saturated with door-knockers, the homeowner has 4 estimates and is comparing prices. A lead intake system that captures the address, schedules the inspection, and gets an estimate in front of the homeowner the same day is the difference between a $12,000 job closed and a prospect who went with whoever called back first.

Material Mismatch on Insurance Jobs

Insurance supplements often approve one product profile and the manufacturer's current production run has changed the color slightly from the original sample. On a full re-side, a slight color shift is a callback. On a partial re-side matching existing siding, a mismatch is a dispute. Confirming product match at material order -- not at delivery -- and documenting the confirmation with photos is the step most siding shops skip under schedule pressure.

Insurance Supplement Delays

The adjuster approved the siding replacement but missed the J-channel, starter strip, and house wrap as separate line items. Your supplement request has been in review for 3 weeks. The homeowner is asking for a start date and you can't give one until the supplement is approved. A supplement tracker that logs submission dates, follow-up intervals, and escalation thresholds keeps your pipeline from stalling in adjuster queues.

Partial Re-Side Match Documentation

A homeowner has wind damage to the south elevation. The insurance claim covers 2 squares of siding on that face. You need to match the existing 15-year-old LP SmartSide or Hardie plank profile, color, and trim detail. If the match isn't perfect, the homeowner sees it every time they pull into the driveway. Documenting the existing product -- brand, profile, color code, batch -- before ordering protects both the install and the customer relationship.

Implementations for every
size of operation

The problems are the same at every scale. The build is different. Here is what SYNTAX deploys depending on where your operation is right now.

Solo Contractor
1 crew
You're estimating, installing, and managing insurance paperwork. SYNTAX captures storm leads through a simple intake, sends estimates fast, tracks supplement submissions, and sends invoices the day the job is complete.
Storm lead intake + fast estimateInsurance supplement trackingInvoice auto-send on job completion
Growing Shop
2-5 crews
You have enough volume that the supplement pipeline and material tracking need a system. SYNTAX manages your open supplement queue with submission dates and follow-up triggers, confirms material match before delivery, and tracks install completion by crew.
Supplement pipeline: submission + follow-upMaterial match confirmation before deliveryCrew install tracking by job
Established Company
6+ crews + commercial
At this scale the profitability is in supplement capture rate and callback rate. SYNTAX builds the reporting layer: supplement approval rate by carrier, average days to approval, material callback rate by product, crew callback rate by job type.
Supplement approval rate by carrierAverage approval timeline trackingMaterial + crew callback analysis

What we build for your operation

We do not sell software subscriptions. We build the automation layer on top of the tools you are already running and deploy it fast. No ripping out your existing stack. Four systems that handle the work that is currently eating your week.

Lead Response
Storm Lead Intake to Estimate

Lead comes in via web form, text, or call. Address captured and inspection scheduled within 2 hours. Inspector on-site: photos taken, damage documented, estimate generated same day. Estimate sent to homeowner with digital sign-off option. Follow-up at 24 hours and 72 hours if unsigned.

Lead captured
→
Inspection scheduled: same day
→
Estimate sent same day
→
Follow-up 24 hrs, 72 hrs
→
Signed: deposit invoice sent
Supplements
Insurance Supplement Submission + Tracking

Supplement scope identified: submission prepared and sent to adjuster with supporting photos. Submission logged with date and line items. Day 7: follow-up. Day 14: escalation to field supervisor or public adjuster if no movement. Approval received: scope reconciled against original contract, additional work order issued if applicable.

Supplement scope prepared + sent
→
Logged with date + line items
→
Day 7 follow-up
→
Day 14 escalation
→
Approval: scope reconciled
Materials
Order Confirmation + Color Match Documentation

Material ordered: manufacturer SKU, color code, profile, and batch documented. Delivery date confirmed. On delivery: batch number checked against order. Color match confirmed on-site with photo logged against job record. Mismatch: held for reorder before installation proceeds. No mismatch callbacks because no mismatch gets installed.

Material ordered: SKU + color documented
→
Delivery date confirmed
→
On delivery: batch checked + photo logged
→
Mismatch: held for reorder
→
Match confirmed: install proceeds
Collections
Invoice + Insurance Final + Review

Job complete: final invoice sent immediately. Insurance direct pay: assignment of benefits tracked and lender coordination handled. Homeowner deductible invoice sent separately. Follow-up at day 3, 7, 14. Review request within 1 hour of final payment.

Job complete: invoice sent immediately
→
Insurance direct pay tracked
→
Deductible invoice sent separately
→
Follow-up day 3, 7, 14
→
Review request within 1 hr
24 hrs
average estimate turnaround after storm damage -- vs. 5-7 days manual -- keeping you ahead of the competitor response wave
Zero
color mismatch callbacks when product batch is confirmed on delivery before installation proceeds
4-6
weeks average payback window -- through faster lead conversion, supplement capture, and faster collections
48
hrs from kickoff to first deployed system running live in your operation

We built these systems
because we needed them first.

SYNTAX came out of Phase III Construction -- an insurance restoration contractor running 5-12 simultaneous jobs across SE Michigan since 1993. Different trade, same structural problem: missed calls, slow collections, callbacks with no data, and jobs that stall when the communication cycle drops. We built these systems because we were the ones bleeding time and margin without them. The same systems that fixed our operation are what we deploy for yours.

See what's possible in 30 minutes

Book a free workflow audit. We'll map your current operation, show you exactly where the hours and margin are going, and walk you through what your operation looks like with those gaps closed. 30 minutes. No software to buy. No long-term contracts.

Book a Free Workflow Audit

Not sure yet? Run the ROI calculator first →